Whirlpool ACM244XE0 Air Conditioner User Manual


 
24. Attach the front panel. Remove the 2
front panel screws from unit base.
Replace front panel by pushing it straight
on and then lowering it slightly to lock it
in place. Attach bottom front of panel by
reinserting the 2 front panel screws.
Through-the-wall installation
It is the consumer’s responsibility and
obligation to have this product installed
by a qualified technician who is familiar
with through-the-wall room air conditioner
installations.
1. Cut an opening through the wail. Re-
move any insulation and keep for Step 8.
2. Measure depth of wail opening and
construct finish frame. Use 1” (25 mm)
or heavier lumber for wood frame con-
struction. When using a wood, metal, or
plastic molding, the finish frame should
line up with the inside wall. If a plastered
wall is to be flush with the cabinet, and no
molding is used, the finish frame must be
set %” (13 mm) back from the finished
plaster surface. See illustrations at right
for frame construction and brick veneer
construction information.
Finish frame measurements include:
A - Wall opening width
B - Wall opening height
C - Depends on wall thickness and
type of molding
NOTE: Apply wood preservative to the
surface exposed to the outside.
continued on next page
13