Weil-McLain 550-110-710/0107 Boiler User Manual


 
GOLD CGi Gas-Fired Water Boiler — Boiler Manual
16
Part Number 550-110-710/0107
Venting — direct exhaust — vent starter3d
1. Select a vent pipe manufacturer and obtain all vent
components needed, based on boiler location and
venting method.
2. You must use the vent starter made by the vent pipe
manufacturer. See separate
CGi, CGs & GV Vent
Component Supplement, for part number of each
component, listed by vent manufacturer.
Use only the vent starter of the same
manufacturer as the vent compo-
nents. Do not mix components
from different systems. The vent
system could fail, causing flue gas
spillage, resulting in severe personal
injury or death.
3. Follow all applicable national, state, local or provin-
cial codes when venting the CGi boiler.
4. Connect vent starter to blower housing outlet as
shown in the
Figures 8 through 11.
a. Do not mix components from different vent
manufacturers.
b. Maintain minimum 2” clearance from com
-
bustible materials to vent pipe.
c. Seal with sealant specified by vent pipe
manufacturer, using
³⁄₈" bead (not required for
FasNSeal™).
d. Tighten strap at band clamp screw until strap
is snug around blower housing.
Figure 8
FasNSeal™
ventstarter
Figure 9
Z-Vent II
vent starter
Figure 11
StaR-34
vent starter
Figure 10
Saf-T Vent®
vent starter