United States Stove 2000 Stove User Manual


 
Ussc 3
Tools and Materials Needed For Installation
Youwillneedadrillwitha1/8”bittoinstallsheetmetalscrewsintoconnectorpipe.A5/16”socket/wrenchorscrewdriver
toinstallpedestaltrim,roomairdeector,andblowerassemblydescribedbelow.A1/2”socket/wrenchtoinstallue
collar.Anon-combustibleoorprotectorasspeciedinthismanual.Allchimneyandchimneyconnectorcomponents
requiredforyourparticularchimneyinstallation.Formobilehomes,seepage13.
Assembly
Flue Collar Assembly:
1. Mounttheuecollartothetopoftheunitasshownusingthe(3)
5/16-18x1-1/2bolts,(3)washers,and(3)weld
tabs
providedinthepartsbox.
Room Air Deector Assembly:
1. LocatetheRoomAirDeector.Usingthethree(3)1/2TekScrewsprovided,mountthedeectortotheunitas
showninthediagram.
Firebrick Conguration:
1.ReplacetheFirebrickasshownintheillustrationbelow.
Side view of ue collar
mount to heater top
Brick Conguration
HEATER
TOP
WELD
TAB
5/16-18 x 1-1/2
BOLT
2000 2500