United States Stove 1800GC Furnace User Manual


 
SPIN DRAFT CAP
1/2" X 2-1/2"
CARRIAGE
BOLT
1/2" LOCK NUT
INSTALLING ASH DOOR SPIN DRAFTINSTALLING ASH DOOR SPIN DRAFT
INSTALLING ASH DOOR SPIN DRAFTINSTALLING ASH DOOR SPIN DRAFT
INSTALLING ASH DOOR SPIN DRAFT
1.Screw spin draft onto 1/2" x 2-1/2" carriage bolt.
2.Screw spin draft and bolt assembly into ash door allowing
approximately 1/2" of the bolt to extend beyond the inside
of the door.
3.Secure bolt in place with 1/2" locking nut.
MOUNTING PROCEDURE FORMOUNTING PROCEDURE FOR
MOUNTING PROCEDURE FORMOUNTING PROCEDURE FOR
MOUNTING PROCEDURE FOR
MOTORIZED NATURAL DRAFTMOTORIZED NATURAL DRAFT
MOTORIZED NATURAL DRAFTMOTORIZED NATURAL DRAFT
MOTORIZED NATURAL DRAFT
DRAFT
TUBE
CLAMP
MOTORIZED NATURAL DRAFT
1.Using (2) 1/4" x 1" bolts, lock washers and nuts,
attach draft to furnace with draft tube clamp.
2.Plug draft power cord into receptacle on front of
furnace.
10