United States Stove 1600M Furnace User Manual


 
8
DISTRIBUTION BLOWER INSTALLATION
Distribution blower slides onto rear of furnace.
Engage blower flange with channels and press down.
SHAKER GRATE HANDLE INSTALLATION
1.Attach angle with two 1/4" x 3/4" hex bolts and two 1/4"
lock nuts.
2.Attach handle with 1/4" x 1" hex bolt and 1/4" lock nut.
3.Put brass knob onto end of handle.
SMOKE DOOR INSTALLATION
INSTALLING ASH DOOR SPIN DRAFT
1.Screw spin draft onto 3/8" x 2-1/2" carriage bolt.
2.Screw spin draft and bolt assembly into ash door
allowing approximately 1/2" of the bolt to extend
beyond the inside of the door.
3.Secure bolt in place with 3/8-16" locking nut.
SPIN DRAFT CAP
3/8-16 x 2-1/2"
CARRIAGE
BOLT
SMOKE DOOR
SMOKE DOOR CLIPS
1/4" X 1-1/4"
CARRIAGE BOLTS
FRONT
OF
FURNACE
FUEL
LOADING
DOOR
FRAME
1/4" LOCK
NUTS
3/8-16" LOCK NUT
1
2
3