Toshiba RAV-SP360AT2-UL Air Conditioner User Manual


 
– 101 –
No.
Part name
Replacement of
electric parts
(Continued)
Procedure
2. Reactor
1) Perform work of Detachment 1 of
,
and
.
2) Remove relay connector connected to the
control P.C. board. (2 positions)
3) Cut the bundling band which bind
compressor lead, relay connector and fan
motor lead. (4 positions)
4) Remove the reactor.
(Trust B tight screw, M4, 6 mm, 2 pcs.)
5) Replace the reactor with a new one.
NOTE :
Be sure to bundle the removed bundling band
with the bundling band on the market.
Be careful so that the fan motor lead does not
come to contact with the reactor body.
Remarks
Bundling band
(Compressor lead, Reactor lead)
Bundling band
(Compressor lead, Reactor lead)
Control P.C. board
Control P.C. board
Reactor lead
Reactor lead
Relay connector
Relay connector
Reactor body
Reactor body
Fan motor lead
Fan motor lead
Control P.C. board
Reactor lead
Relay connector
Reactor body
Fan motor lead