Toshiba CEILING TYPE Air Conditioner User Manual


 
– 99 –
Drain pump holder
Screws (Fixing drain pump holder)
Drain pump
Screws (Fixing plate and drain pump)
Drain pump holder
(6) -3. View from reverse side of drain pump
Checking port cover (Right side)
Screws (Fixing check port cover (Right side))
Check port cover (Left side)
Screws (Fixing check port cover (Left side))
Main unit (Left side)
Screws (Fixing heat exchanger)
Screws
Main unit (Front side)
6
6 -2
6 -3
7 -1
8 -4
8 -5
8 -6
No.
Part name
Drain pump
TC, TCJ sensor
Heat
exchanger
Procedure
1. Remove the drain pan and float switch.
2. Remove the set screws (3 positions) of
fixing drain pump plate and main unit.
3. Remove the set screws (3 positions) of
fixing drain pump plate and drain pump.
1. Remove the set screws (5 positions) and
check port cover (right side).
2. Pull out the sensor is inserted into pipe of
the heat exchanger.
1. Take down the main unit and then treat the
heat exchanger on the floor.
2. Remove the drain pan.
3. Remove the check port cover (right side).
4. Remove the set screws (6 positions) and
check port cover (left side).
5. Remove the set screws (2 positions) of
fixing heat exchanger and main unit
(left side).
6. Remove the set screws (7 positions) of
fixing heat exchanger and main unit
(front right side).
Remarks