State Industries SW 37-670 Boiler User Manual


 
17
MAINTENANCE
Boiler maintenance includes periodic tank ushing and cleaning, and
removal of lime scale from the heating elements. Circulating pumps
should be oiled.
MAINTENANCE SCHEDULE
Component Operation Interval Required
Tank
Flushing Monthly
Sediment
Removal
As Needed
Elements
Lime Scale
Removal
As Needed
UN•LIME
®
Delimer and
element gaskets
Circulating Pump(s) Oiling Per pump makers instructions
Pressure Relief
Valve Test
Manually
Operate
Anually
PRESSURE RELIEF VALVE TEST
The pressure relief valve must be manually operated at least once a
year. Caution should be taken to ensure that (1) no one is in front of
or around the outlet of the pressure relief valve discharge line, and
(2) the water manually discharged will not cause any bodily injury or
property damage because the water may be extremely hot.
To test the relief valve, lift the lever at the end of the valve several times,
see Figure 2. The valve should seat properly and operate freely.
FIGURE 2.
If after manually operating the valve, it fails to completely reset and
continues to release water, turn off power to the boiler at the main
disconnect switch or breaker. Close the cold water inlet to the boiler and
follow the draining instructions in this manual to drain the boiler. Should
the relief valve need to be replaced, call the toll free phone number
listed on the back of this manual for further technical assistance.
Tank ushing and circulating pump lubrication should be performed
in accordance with the above schedule. Tank sediment removal and
element lime scale removal must be performed when needed as
determined by period inspections. Following are the instructions for
performing recommended maintenance.
SYSTEM CLEANING
The hot water system should be internally cleaned and ushed to
remove contaminants which may have accumulated during installation.
System cleaning provides chemical stability necessary for component
life and system performance.
Failuretocleanthesystemmaycause:
1. Poor heating due to formation of gas.
Residential pipe dope, thread cutting oil, solder ux, dirt and other
foreign materials breakdown to form gas. This is indicated by a
continuing need for purging even through the system is “closed”.
2. Pump seal leakage.
Acidic water (low pH) and contamination such as soil and sand
result in premature or recurring pump seal failures.
3. Automatic air valve leakage.
Contaminants cause sticky sealing surfaces and result in leakage.
4. Relief valve operation.
Gas formation increases system pressure and relief valve spillage.
5. Water leaks at joints and ttings.
Corrosion and eventual failure of connections occur when
system pH is low.
6. Noisy operation.
Heat transfer surfaces can be fouled with dirty, oily water. This
plus gas lead to noisy water circulation.
FLUSHING
1. Turn off the electrical disconnect switch.
2. Open the boiler drain valve. Allow water to ow to an open drain
until it runs clean. Do not come in contact with the water being
drained as it may be very hot.
3. Close the drain valve when nished ushing.
4. Turn on the electrical disconnect switch.
SEDIMENT REMOVAL
Water borne impurities consist of ne particles of soil and sand which
settle out and form a layer of sediment on the bottom of the tank. In time,
if not removed, the level of sediment might reach the heating elements.
For convenience, sediment removal and element lime scale removal
should be performed at the same time as follows:
WATER AND LIME SCALE REMOVAL
Water and lime scale accumulations on the heating elements is a
normal condition, common to all immersion type elements. Factors
which affect the amount of this formation are:
1. Amount of make-up water used. As the volume of make-up water
heated increases, more scale results.
2. Water temperature. As the temperature of the water is increased,
more scale is deposited on the elements.
3. Characteristics of water supply. Regardless of water treatment,
the elements should be examined regularly.
Water scale accumulations may cause noises to occur during operation.
It is recommended that a lower heating element be removed
periodically for examination. If it is scaled, all of the elements should
be removed and cleaned. If the tank bottom has an accumulation of
sediment, it should be cleaned.