Verticalterminationispreferred.Fieldsuppliedpipeandfittings
arerequiredtocompletetheinstallation.
Kit Contents:
Kit Components
3" RainCapor 2" Rain Cap
3;;DiameterSDR-26 Pipe,191/2;;Long or
4 DiameterSDR-26 Pipe,371/8,Long,
2 DiameterSDR-26 Pipe,315/8 Long or
21/2"DiameterSDR-26 Pipe,24"Long,
3" YConcentric Fittingor 2" YConcentricFitting
3"or4"Dia.
SDR-26Pipe
2" or3"Dia. 2 or21/2"Dia.
¥ ConcentricFitting SDR-26Pipe
13/16"
2"or3"Dia.
RainCap
25-22-03
Vertical & Horizontal Termination
1. Determine the pipe diameters required for the installation
from Table 10 and Table 11 and Figure 46.
2. Determine the best location for the termination kit. See
Figure45 for vertical termination or Figure 45 and
Figure 49 for horizontal termination. Roof termination is
preferred since it is less susceptible to damage, has re-
duced intake contaminants and less visible vent vapor. For
side wall termination, consideration should be given to: 1)
possible damage from the vapors to plants/shrubs, other
equipment and building materials, 2) possible damage to
the terminal from foreign objects, 3) wind effects that may
cause recirculation of flue products, debris or light snow
and 4) visible vent vapor.
3. Cut one 5" diameter hole through the structure for the
NAHA001CV Kit or one 4" diameter hole for the
NAHA002CV Kit.
4. Dimension D may be lengthened to 60" max. or shortened
by cutting the pipes to 12" min. Dimension A will change ac-
cording to D dimension. (See Figure 46)
Concentric Vent Roof Installation
Vent /_ Maintain12"min.clearanceabove
_Y
highestanticipatedsnowlevel.Max.
of24"aboveroof.
Combustion
Air
Roof Boot/
Flashing
Support
(Field Supplied)
(Field Supplied)
Vent
Combustion
Air 25-22-02
Note:
SUDDort must be field installed to secure termination kit to structure.
//
{t :::i;{i {}}i{
Concentric Vent Dimensional
Drawing
11/2"
BPVC
\Ven haustI
25-22-03
Model A* B C D**
NAHAO01CV 38z/8 3 41/2 211/8
NAHAOO2CV 33s/8 2 31/2 16//8
= Dimension will change accordingly as dimension D is
lengthened or shortened.
_ = Dimension D may be lengthened to 60" may also be
shortened by cutting the pipes provided in the kit to 12"
minimum
i ' ;: ; Concentric Termination Kit
_bI_ 0 , NAHA001CV & NAHA002CV Venting
Table for *9MPD Models
50,000, 75,000 & 80,000 Btuh Furnaces
NAHAOO2CV - 35' & (4) 90° elbows with 2" PVC pipe or
NAHAOOICV - 65' & (4) 90° elbows with 3" PVC pipe
100,000 Btuh Furnace
NAHAOOICV - 35' & (4) 90° elbows with 3" PVC pipe or
NAHAOOICV - 65' & (4) 90° elbows with 3" PVC pipe &
Long Vent Kit (See Tech. Manual)
125,000 Btuh Furnace
NAHAOOICV - 35' & (4) 90 ° elbows with 3" PVC pipe
1. Do not include the field supplied 45 ° elbow in the total elbow
count,
2. If more than four elbows are required, reduce the length of
both the inlet and the exhaust pipes five feet for each
additional elbow used.
3, Elbows are DWV long radius type for 2" and 3" vents,
NOTE: Feet of pipe is whichever pipe run is the longest, either
inlet or outlet side,