Sears 139.53627SRT Garage Door Opener User Manual


 
nstallation Step 5
Hang the Opener
Two representative installations are shown.
Yours may be different. Hanging brackets should
be angled, Figure 1, to provide rigid support. On
finished ceilings, Figure 2, attach a sturdy metal
bracket to structural supports before installing the
opener. The bracket and fastening hardware are not
supplied. See accessory page 38.
Measure the distance from each side of the opener
to the structural support.
Cut both pieces of the hanging bracket to required
lengths.
Drill 3/18" pilot holes in the structural supports.
Attach one end of each bracket to a support with
5/16"xl-7/8" lag screws.
Fasten the opener to the hanging brackets with
5/18"-18x7/8" screws, lock washers and nuts.
Check to make sure the T-rail is centered over the
door (or in line with the header bracket if the
bracket is not centered above the door).
Remove the 2x4. Operate the door manually. If the
door hits the rail, raise the header bracket.
Figure 1
/ Supports
/
Measure ',
Distance
5/16"-18x7/8" Screw
5/16" Lock Washer
5/16"-18 Nut
Screws
5/16"xl-7/8"
Figure 2
Hardware Shown Actual Size
5/16" Lock Washer
5/16"- 18
Lag Screw
5/16"-18xl -7/8"
Hex Screw
5/16"- 18x7/8"
©
Nut 5/16"-18
©
Lock Washer 5/16"
17