Sears 139.53627SRT Garage Door Opener User Manual


 
Installation Step 3
Attach the T-rail to the Header Bracket
-- Header WalI
Header
Bracket
Cable
Putley
Bracket
Position the opener on the garage floor below the
header bracket. Use packing material as a
protective base.
If the door spring is in the way you'll need help.
Have someone hold the opener securely on a
temporary support to allow the T-rail to clear the
spring.
Position the cable pulley bracket against the header
bracket.
Align the bracket holes and join with a clevis pin as
shown.
Insert a ring fastener to secure.
Ring Fastener
Header Bracket 0
i
C_
\\ I
Ctevis Pin
5/16"x2-3/4 "
Cable
Pulley
Bracket
Door
Temporary
Support
Hardware Shown Actual Size
°1
Clevis Pin
5/16"x2-3/4"
O
Ring Fastener
15