Samsung ACC2800C Air Conditioner User Manual


 
Indoor Unit Installation
()
17
11
16
()
20
13
16
1
Place the pattern sheet on the ceiling at the spot where you want to
install the indoor unit.
2
Insert bolt anchors, use existing ceiling supports or construct a suitable
support as shown in figure.
3
Install the suspension bolts depending on the ceiling type.
4
Screw eight nuts to the suspension bolts making space for hanging
the indoor unit.
5
Hang the indoor unit to the suspension bolts between two nuts.
6
Screw the nuts to suspend the unit. Cut a pad stopper and place it on the
bracket at this time.
7
Adjust the unit to the appropriate position considering the installation area for the front
panel.
7-1 Place the pattern sheet on the indoor unit.
7-2 Adjust a space between the ceiling and the indoor unit by using the gauge
of dimensions.
7-3 Fix the indoor unit securely after adjusting level of the unit by using a leveler.
7-4 Remove the pattern sheet, connect the other cables and install the front panel.
Ensure that the ceiling is strong enough to support
the weight of the indoor unit.
Before hanging the unit, test the strength of each
attached suspension bolt.
IMPORTANT
You must install the suspension bolts more than four
when installing the indoor unit.
IMPORTANT
Tubing must be laid and connected inside the ceiling when
suspending the unit. If the ceiling is already constructed, lay
the tubing into position for connection to the unit before
placing the unit inside the ceiling.
NN
NN
oo
oo
tt
tt
ee
ee
Since the diagram is made of paper, it may shrink or stretch
slightly due to temperature or humidity. For this reason,
before drilling the holes maintain the correct dimensions
between the markings; refer to page 34.
NN
NN
oo
oo
tt
tt
ee
ee
Concrete
Suspension bolt(M8)-field supply
Hole in anchor
Hole in plug
Insert
Ceiling support
Unit:mm(inch)
Ceiling
Indoor Unit
Gauge of
Dimensions
Pad stopper
Bracket
E-
39
ENGLISH