Rinnai E110CP Boiler User Manual


 
Installation & Servicing Instructions Rinnai E-Series
56
13 Maintenance
Maintenance or changes to the boiler may only be carried out by a qualied
technician.
13.1 Periodic examination of venting systems and boiler
The inspection of the boiler and venting system should be done every 2 years and
full maintenance every 4 years or 4000 hours of operation, whichever occurs rst..
When doing this the circumstances of the boiler’s location must be taken into account.
From this one can determine whether to deviate from this advice.
Please contact Rinnai for further guidance on the frequency and service
requirements. Contact details can be found on the back page of this manual.
13.2 Inspection
Preparing the boiler for inspection
To carry out the maintenance activities please follow the next procedure:
- switch off the power supply;
- shut off the gas;
- valve off the boiler from the system using the boiler isolation valves in the plumbing
kit.
-
remove the 4 screws A,B,C and D in the quick releases of the casing (gure 25);
- remove the screw E behind the door on the front of the casing (gure 26);
- remove it towards the front.
- clean the casing with a cloth with a simple (non-abrasive) cleaning agent;
NOTICE
i
NOTICE
i
Removing casing gure 25
Removing casing gure 26