Part 6 Replacement Parts List
Insert replacement parts list and parts drawing here.
Part 7 Conversion Instructions
1. Disconnect power to the unit and shut off the gas supply.
2. Remove the window frame assembly. (see the Window Frame
Assembly section)
3. Carefully remove the logs. (ensure they are not hot)
4. Remove pilot assembly from bracket.
5. Remove the 2 screws holding the burner housing assembly in place.
6. Remove the burner housing assembly.
7. Remove the main and front orifice and replace with the orifice supplied
in the conversion kit. Use the small orifice size for the front burner and
the bigger orifice size for the main burner.
8. Remove the compression fitting which holds the aluminium tubing in
the pilot assembly. This will reveal the pilot injector which must be
replaced with the pilot injector provided in the conversion kit.
9. Honeywell Gas Valve -: The Honeywell valve fitted to this appliance is
preset for Propane gas. It is convertible to natural gas by a colour
coded “conversion screw”. To insert the conversion screw, refer to the
instructions and diagrams in the Honeywell Installation Instructions
supplied in the conversion kit packaged with the RFSDV34 unit.
10. Reassemble the fireplace in reverse order except for the window frame
assembly. Leave the window frame assembly off until the unit has been
checked for leaks and the gas supply has been purged.
11. After purging the gas line and checking for leaks with soapy water,
replace the window frame assembly. Light the unit and check for frame
impingement on logs, adjusting them if necessary. Check the manifold
and supply pressures.
NOTE: If further assistance is required, refer to the Troubleshooting
and Parts List in this manual.
Page 21 of 27