Quadra-Fire 810-02901 Indoor Fireplace User Manual


 
Page 20
250-7251G
August 20, 2009
R
Castile Pellet Insert
Install Sides
First
Install Front Last
Bend top and bottom tabs toward inside
NOTE: Manually
pre-shape sides before
installing
Turn right side up and attach top cast rin g
Zero Clearance Panel Extension
Alignment
Hole
Cast Trim
Footer
Panel Leg
Base Plate Only Installation
Parts Needed: (1) cast ring (2) base zero clearance panel
extensions. Discard balance of parts.
Tools Needed:
Phillips head screwdriver
1. Attach base zero clearance panel extensions to cast
ring.
2. Place assembly under appliance.
1. Remove contents from box and lay on protective surface
to avoid scratching the paint.
2. Lay zero clearance front and sides face down. Bend the
tab down toward the inside.
3.
The side pieces are shipped fl at. It
is much easier to
manually fl ex the sides into a bowed position before
installing.
4.
Lay 1 cast ring face up, which
will become the bottom ring
when installed. Attach the 2 sides FIRST and then the
front piece. Figure 20.1.
5. Now turn the cast ring right side up
and attach the top cast
ring . Figure 20.2.
6. Attach the zero clearance panel extensions. Figure
20.3
7. Attach cast footers. Figure 20.4.
8. Place the assembled zero clearance trim support under
the insert. Figure 20.5.
Zero Clearance
Panel Extension
Panel Leg
Cast Trim Footer
D. Zero Clearance Trim Support (Cont’d)
Figure 20.1
Figure 20.2
Figure 20.3
Figure 20.4
Figure 20.5
Figure 20.6