PVI Industries PV 500-6 Water Heater User Manual


 
DURAWATT
®
ELECTRIC WATER HEATER
PV500-6 09/07 13
SUPERTANK BOLTED HEAD REMOVAL
SUPERTANK water heaters and storage tanks will have one or more removable heads or bolted tank sections. The
heads are used to mount an energy module (i.e. TURBOPOWER
®
module, electric elements, QUICKDRAW
®
or steam or
water heat exchanger heating elements) or bolted head for access to the tank. If a head or module is removed during the
course of maintenance, replace the O-ring and all special
high quality 9/16”-12 NC, grade 8 bolts, washers and nuts with
identical parts available from your PVI representative or directly from PVI. Do not reuse or substitute these special
fasteners with similar grade 8 bolts, washers and nuts. Install the flange bolts and nuts with a flat washer under each bolt
head and nut. First, snug them in an alternating star pattern. Then, using a calibrated torque wrench, and in an alternating
star pattern, tighten the bolts in 2 increments: 95 ft lbs and 145 ft lbs. Use a small amount of silicone RTV to hold the o-
ring in place while positioning the flanged head or heat exchanger. Apply adhesive sparingly!
Contact PVI at 1-800-433-5654 for replacement Fastener Kits and O-Ring Replacement Instructions.
IMPORTANT: Mark one hole on head and on tank flange for reference when removing head. Be certain to align these
holes during reassembly to insure the original gasket or O-ring mating surfaces will be correctly positioned.
Typical Vertical SUPERTANK Bolted Head Attachment
FIGURE 13