Pella 80ED0101 Window User Manual


 
INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION
FOR HURRICANESHIELD
®
IMPACT-RESISTANT
DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG
Part Number: 80ED0101
©2008 Pella Corporation
Instrucciones en español en el reverso.
Fin
Corner
Nailing Fin
Window Bottom
Sill Flashing Tape #2
Sill Flashing Tape #1
Water Resistive Barrier
Sheathing
Framin
g
Checkrail
Corner
Flashing
Tape
Top
Flashing
Tape
Corner
Flashing
Tape
Side
Flashing
Tape
Side
Flashing
Tape
Window Top
Always read the Pella
Limited Warranty before purchasing or installing Pella products. By installing
this product, you are acknowledging that this Limited Warranty is part of the terms of the sale.
Failure to comply with all Pella installation and maintenance instructions may void your Pella
product warranty. See Limited Warranty for complete details at http://www.pella.com.
Important Safety Information:
Pella
®
HurricaneShield
®
Products have been tested in accordance with the large missile impact testing
requirements of ASTM E 1886 and ASTM E 1996. Pella HurricaneShield Products are neither
hurricane proof nor are they shatter proof. Severe wind and rain may produce temporary conditions
which exceed product performance standards. When these units are subjected to intense storms or
extreme conditions, which exceed the intended design pressures, air, water and flying debris infiltration
may occur.
The performance of any building is dependent upon the design, installation, and workmanship of the
entire building system. Pella Corporation strongly recommends consulting an experienced architect,
contractor, or structural engineer prior to installation of Pella products.
The individual (building owner, architect, contractor, installer and/or consumer) responsible for the
project must take into account local conditions, building codes, inherent component limitations,
the effects of aging and weathering on building components, and other design issues relevant to each
project.
The determination of the suitability of all building components for each project, as well as the design
and installation of flashing and sealing systems, are the responsibility of the building owner, architect,
contractor, installer and/or consumer.