Nortec NHPC Humidifier User Manual


 
10-20
Page 72
2008-10-01
1 Training of the owner’s operation and maintenance personnel is required in
co-operation with the commissioning authority. Provide competent, factory
authorized personnel to provide instruction to operation and maintenance
personnel concerning the location, operation, and troubleshooting of the
installed systems. The instruction shall be scheduled in coordination with the
commissioning authority after submission and approval of formal training
plans. Refer to System Demonstrations, section 01670, for contractor training
requirements. Refer to section 01810, Commissioning, for further contractor
training requirements; or
2
Engage a factory-authorized service representative to train owner’s
maintenance personnel to adjust, operate, and maintain humidifiers.
a
Train owner’s maintenance personnel on procedures and schedules for
starting and stopping, troubleshooting, servicing, and maintaining
equipment and schedules.
b
Review data in maintenance manuals. Refer to Division 1 Section
Contract Closeout.
c
Review data in maintenance manuals. Refer to Division 1 Section
Operation and Maintenance Data.
d
Schedule training with owner, through architect, with at least seven days
advance notice.