Mitsubishi Electronics PUHY-P72 Air Conditioner User Manual


 
[ VII Control ]
- 102 -
HWE08040 GB
(2) P144, P168, P192, P216, P240 models
1 Qj:Total capacity (models) code
Refer to the VII [1] 2. (1) Dipswitches for the capacity code. (page 93)
Yes
No
50 F 60Hz (both OC and OS)
or F < 50Hz (both OC and OS)
Completed in the integrated operation time of 35 minutes.
Completed in the integrated operation time of 90 minutes.
The compressor on the OC remains in operation, and the
compressor on the OS starts up.
50 F 60Hz (OC)
or F < 50Hz (OC)
Completed in the integrated operation time of 35 minutes.
Completed in the integrated operation time of 90 minutes.
The compressor on the OC starts up.
Both the OC and OS stop.
The startup sequence of the OC and OS is rotated.
50 F 60Hz (OS)
or F < 50Hz (OS)
Completed in the integrated operation time of 35 minutes.
Completed in the integrated operation time of 90 minutes.
The compressor on the OS starts up.
*2
*3
*2
The air conditioning load is too small
for both the OC and the OS to
simultaneously stay in operation.
*3
The air conditioning load is
high enough for both OC and OS to
simultaneously stay in operation.
Initial startup mode complete
The compressor on the OC starts up.
The total operating load of the indoor unit
after 5 minutes of operation is P96 or above.
(
*1
Qj 50)
Initial startup mode starts.
F 60Hz