OPERATING PROCEDURE
PHOTOS
6. Removing the compressor and 4-way valve
(1) Remove the top panel, cabinet, service panel and the back
panel. (Refer to 1.)
(2) Remove the inverter assembly. (Refer to 2.)
(3) Remove the R.V. coil. (Refer to 3.)
(4) Recover gas from the refrigerant circuit.
NOTE: Recover gas from the pipes until the pressure
gauge shows 0 PSIG.
(5) Detach the welded part of the suction and the discharge
pipe connected with compressor. (Photo 9)
(6) Remove the compressor nuts.
(7) Remove the compressor.
(8) Detach the welded part of 4-way valve and pipe. (Photo 8)
7. Removing the reactor
(1) Remove the top panel, cabinet, service panel and the back
panel. (Refer to 1.)
(2) Disconnect the reactor lead wire.
(3) Remove the screws of the reactor, and remove the reactor.