Before replacement:
Installed 8 years ago
Model name
PLH-3GKHB/
PUH-3YKA
After replacement:
Power Inverter
Model name
PLA-RP71AA/
PUHZ-RP71VHA
Conditions of trial calculation
(according to Japan Refrigerant Association)
Power Inverter Non-Inverter
(
R407C
)
COP
Outdoor Unit
3.5
3.0
2.25
3.60
3HP
2.61
3.30
4HP
2.55
3.21
5HP 6HP1.6HP 2HP 2.5HP
2.17
3.23
2.42
3.36
2.40
3.64
2.40
2.81
Average
38
%
increase
Comparison of COP between non-inverter and power inverter
(4-way cassette type) models.
70
%
reduction
60%
UP
52%
UP
26%
UP
26%
UP
49%
UP
39%
UP
R407C
Non-Inverter
R410A
Power Inverter (Maximum capacity)
1.6HP 4.4 4.5
102%
2HP 5.3 5.6
106%
2.5HP 6.3 6.7
106%
3HP 7.7 8.1
105%
4HP 9.6 11.4
119%
5HP 12.7 14.0
110%
6HP 14.2 15.3
108%
8HP 20.9 22.4
107%
10HP 26.0 28.0
105%
Cooling capacity
3HP 3.3-8.1 kW
5HP 5.5-14.0 kW
4HP 4.9-11.4 kW
6HP 5.5-15.3 kW
8HP 10.0-22.4 kW
10HP 12.5-28.0 kW
0 2 4 6 8 101214161820222426
kW
Cooling capacity ranges
Running current comparison.
The cooling & heating capacities at the maximum operating
speed have also been improved by up to 33% compared
to the current model.
Operation is now possible at lower speeds, thus cutting
energy losses produced by the repeated on/off operation
of non-inverter models. Comfort is improved while power
consumption is reduced.
Higher Cooling & Heating Power Wider Performance Range
3 phase power supply
"Power Inverter"
(RP100 - 250YHA)
The other features;
*
Replace filter equipped (to Reuse the existing pipe works)
*
High efficiency operation
*
Silent operation (Only 52dB in silent mode: 20.0kW)
Compact top flow models
(20 & 25kW Power Inverter)
By additional filling with refrigerant, it is now possible to
have pipes up to 120 metres long, making it easier to
select a layout to install the unit.
Dramatic reduction of running current is realized by 3
phase power supply. The special technology is installed in
the outdoor unit to comply with the Electro Magnetic
Compatibility in Europe.
Harmonics Filter Technology
We have successfully complied with
the EMC regulations (EN61000-3-
2,Class-A) first in the industry in the
category of 3 phase inverter driven
air conditioners requiring less than
16A current input.
Less than half in the running current and the breaker size !!
The Other Features
-20˚C Heating is possible
(for RP100/125/140/200/250)
Cleaning Free Pipe Reuse.
Silent Operation (outdoor unit)
Longer Piping Length
Max Height difference
Max piping Length
PUHZ-RP35/50
PUHZ-RP60/71
PUHZ-RP100/125/140
30m
30m
30m
50m
50m
75m
PUHZ-RP200/250
40m 120m
Max Piping Length
can be stretched to
120m
1. Power Consumption
Energy Saving
2. COP
Based on our calculations on
the operating conditions
shown below, the new Power
Inverter system can reduce
power consumption by appro
xi-
mately
70% compared to an
old model installed 8 years ago.
17%
UP
990
300990500
750
900
100450
198
kg
225
kg
1.97m
2
1.17m
2
3 phase
1 phase
Rated (cooling)
Rated (heating)
Max
Breaker size
Rated (cooling)
Rated (heating)
Max
Breaker size
3.79
4.33
13
16
12.33
13.94
28
32
4.85
5.41
13
16
15.8
17.5
28
32
6.49
6.37
13
16
20.73
20.37
29.5
40
10kW
990
990
750
900
Unit size
Unit: mm
Unit: mm
Space
for
Servicing
PUH-8YD
New Power Inverter
PUHZ-RP200YHA
Depth
Reduced by
240
mm
Weight
Reduced by
Space for Servicing
*In case of installing one
intake/blow off open unit
27kg
Service space
Reduced by
40%
Outdoor Units
Wall Mounted4 Way Ceiling Cassette
Ceiling Concealed
Professional Kitchen
Floor Standing
Ceiling Suspended
Thanks to the new Power Inverter system, a large reduction in power consumption is
now possible. This results in one of the highest COP ratings in the industry, helping
to lower overall running costs and providing great savings to customers.
Power Inverter
Indoor Units
converter circuit
1.6HP 1.6-4.5kW
2HP 2.3-5.6kW
2.5HP 2.7-6.7 kW
12.5kW 14.0kW
The greatly improved COP contributes to reduce your
electricity bills drastically.
Comparison of unit size and space for servicing
Place
Office in Tokyo
(
Japan
)
Operating
time
8AM to 8PM
(
12 hours/day
)
& 6 days/week
Set
temperature
Cooling: 27°C, Heating: 20°C
Cooling: April 16 ~ November 8
Heating: December 14 ~ March 23
Operating
period
19
20