4. Assemble the right front bar to a rear bar. Slide a gear
onto the front shaft, aligning it to engage the gear on the
left bar. Place the front bar onto the front frame and then
setting the rear bar onto the rear frame.
5. Place rear retainer in place, then the center and the
front retainers. Place all four bolts through retainers and
frame. Secure with locknuts. To prevent binding, it is ad
-
visable to snug the locknuts but do not over tighten.
6. Try moving the shaker grate bars with the handle.
NOTE: Both bars in normal position should be flat. If not,
one or the other gear is not aligned correctly.
7. To install the assembly into the unit, place the front
end of the assembled grate on the loading door lower
frame. The grate should be the upside down position.
Slide the grate (front end first) into the firebox allowing
the front end to lower into the hearth area. Once the
back end of the grate has cleared the door frame, “flip” it
over toward the rear of the unit. If necessary, reach into
the ash pit door and pull the front of the grate forward
until it lodges into place.
INSTALL SHAKER GRATE HANDLE,
MODEL 2900 ONLY
1. Open the door ash door. Slide the shaker grate handle
through the opening in the side of the door frame and
guide it through the actuator arm and into the receiving
boss on the opposite side of the frame.
2. Secure handle to actuator with 1/4x1-1/2 bolt and nut.
See figure 15.
FIGURE 14 POOR INSTALLATIONS
RECEIVING BOSS
ASH DOOR FRAME
1/4x1-1/2 BOLT
ACTUATOR ARM
SHAKER GRATE HANDLE
ALIGN HOLES
FIGURE 15 INSTALL SHAKER GRATE HANDLE