Meyer woodchuck Furnace User Manual


 
20
FIGURE 11 HOT AIR DUCT CLEARANCE REQUIREMENTS
FIGURE 12 PARALLEL ADD-ON INSTALLATION
FIGURE 13 CENTRAL ADD-ON INSTALLATION
WOODCHUCK FINAL ASSEMBLY
OPTIONAL SHAKER GRATE INSTALLATION
FOR MODEL 526
1. Remove standard grates from firebox. Assemble com
-
plete shaker grate kit outside of unit. Figure 16.
2. Assemble the left front bar (different from right front bar,
has shorter extension shaft at front) to a rear bar. Slide a
gear onto the front shaft.
3. Set this assembly into the front frame first and then into
the rear frame.