Majestic Appliances 2490 Stove User Manual


 
16
Vermont Castings Resolute Acclaim
2000893
Because of their restricted air flow and heat retention characteristics, specific construction requirements and special
clearances apply to installations into alcoves. No stove or chimney connector heat shields are used in alcove installa-
tions. Bottom heat shield requirements remain the same as for other installations.
ALCOVE INSTALLATION OF THE RESOLUTE ACCLAIM IS NOT PERMITTED IN CANADA.
Alcove Installations
Construction Requirements
Showing non-combustible ceiling framing and maxi-
mum and minimum permitted dimensions
ST504
Fig. 22 Cutaway perspective of alcove installation.
24"
14¹⁄₄"
48" Min.
11"
Min.
36"
Min.
Existings
Combustible Framing
Metal studs
support 7/16”
Durock© (or
equivalent)
ceiling
ST505
Fig. 23 Reflected ceiling plan.
36"
Max.
48" Min.
7/16” Durock©
(or equivalent)
spaced 1” off
wood studs on
noncombustible
spacers
Use recommended
floor protection
ST502
Fig. 24 Floor plan. Sheetrock on front face butts to Durock©
(or equivalent) alcove lining.
65"
62" Min.
to Alcove
Ceiling
Ceiling support
package
extends 2”
below Durock©
(or equivalent)
ceiling
1” air gap,
top, bottom,
on both sides
and back
wall
ST610
NOTE: From
62” to 65”
must be
covered by a
noncombus-
tible material.
Fig. 26 Front section: 65” minimum clearance to combus-
tibles on front face. Combustible facing may overlap metal
studs by only 1”. It should not extend below the height of the
noncombustible ceiling.
RESOLUTE
Acclaim
Joist Shield
(supplied
by chimney
manufac-
turer)
Metal
Stud
Combustible
facing may
overlap
metal studs
by only 1”
7/16” Durock© (or
equivalent)
1” air gap top
and bottom,
on both sides
and back
wall
ST609
Fig. 25 Alcove side section.