Lightolier 1001FEM Series Indoor Furnishings User Manual


 
INSTALLATION INSTRUCTIONS FOR STEEL CONSTRUCTION APPLICATIONS
1
PREPARATION: Remove Wing Nuts on T-Bar Clips and reverse clips to inside of Luminaire Frame. Loosen Wing
Nuts on Frame Clamps enough to allow free movement of Mounting Bars. Using standard ½” EMT tubing, cut pieces
to required length such that it spans across Hat Channel. Position EMT across Frame Mounting Bars and loosely
secure to End Brackets with T-Bar Clips. (Figures A, B, & C)
NOTE: The Mounting Bars may be readily adjusted to fit desired openings between 13” (330mm) minimum and 24”
(610mm) maximum.
2
POSITION AND INSTALL LUMINAIRE FRAME: Position Luminaire Frame at approximate location with EMT resting
on Hat Channel. Secure EMT to Hat Channel. Adjust frame to final location by sliding along EMT & Mounting Bars.
Lock the Frame in place by tightening the Wing Nuts on the Frame Clamps and T-Bar Clips.
NOTE: When the Luminaire Frame is to be used with Wall Wash Trims make sure to orient the Luminaire
Frame side indicated by a label on the frame towards the wall to be illuminated.
Figure A
Figure B
Figure C
INSTRUCTION SHEET NO.
IS:1101FEM
D1007
Page 3 of 4
INSTALLATION PROCEDURE FOR:
1001FEM, 1101FEM and 1101FEL Series Frame-In Kits
with Emergency Backup
IMPORTANT SAFEGUARDS
READ AND FOLLOW ALL SAFETY
A COMPANY
631 Airport Road, Fall River, MA 02720