INSTALLATION
Install the Supply Pipes
Single Bodyspray Installations
1. Install the water supply pipes. Do not
fix the pipework at this time.
2. Install an elbow to the end of the supply
pipe at the bodyspray installation
location.
Multiple Bodyspray Installations
1. Install the water supply pipes. Do not
fix the pipework at this time.
2. If installing more than one bodyspray
off the same supply line, construct
a pressure balancing loop. Locate a
tee along the loop at each bodyspray
installation location.
For All Installations
1. Temporarily install the nipple (supplied
to each tee/elbow. Do not use any
sealant.
Install the Plaster Guard
1. Fix the wall elbow or tee to the back of
the supporting structure.
2. Install the plater guard against the face
of the elbow or tee.
Important! make sure that there
is sufficient building-in depth. The
minimum dimension from the back of
the wall elbow to the front face of the
finished wall (including tile thickness) is
79 mm.
Before you Begin
1. Turn off the water supply.
2. Kohler Co. reserves the right to make revisions in the design of products without
notice.
Single Bodyspray Installation
Multiple Bodyspray Installation
Nipple
Nipple
Pressure
Balancing Loop
Water
Supply Pipe
Elbow (or Tee)
Install the Plaster Guard
Plaster Guard