Karcher SHD-R 3000 Water Pump User Manual


 
English
SHD-R 3000
5.956-486 A2005937 (06/03)
I1
I. System installation
This system should only be installed by
Kärcher Customer Service engineers,
persons who have been specially
authorized by Kärcher.
Unpacking the system
Unpack the system and deliver the packag-
ing materials to an appropriate collection
point for recycling.
For static systems
Preparing the installation site
A horizontal, flat area or base of 1400 x
750 mm is required for installing the
system.
Place the system on the designated area
or base and align it exactly.
Install the unit in such a way as to ensure
that it can be easily accessed for
maintenance work.
Secure in position with suitable materials.
For static and mobile systems
Connecting hoses for supply
of cleaning liquid
Caution!
Vibrations generated by the system during
operation could cause damage to the main
water supply network, therefore connect the
system by means of flexible hoses.
Connect the supply hose for cleaning
liquid to the system (Thread R 1 1/4").
Connect the high-pressure hose for the
cleaning liquid output to the system
(Thread M22 x 1.5).
Check the oil level
The level of oil in the reservoir on the high-
pressure pump should be between the MIN
and MAX marks. Fill up with oil if the level
is below the MIN mark.
Electrical connections
!
Danger!
Dangerous voltage. The electrical installation
should only be carried out by a qualified
electrician in accordance with current local
regulations.
Connect the electric motor into the
terminal strip.
Switch on motor briefly, and check
direction of rotation.
Start up the system
Switching off in an emergency
(see Chapter B)