Jacuzzi F258000 Plumbing Product User Manual


 
10
TOWER INSTALLATION
1. To locate the drilling template, place it over the bath. The template should be against the bath flange edge
and template corner 'A' should be at the bath's corner. (See Illustration 9.)
Note: If bath has been installed with finish materials over bath flange, trim an amount off the template along
the bath flange edge equal to the thickness of mortar and finish materials. (See Illustration 9A.)
2. The inner orange circle should be centered over the circular opening of the bathtub. (See Illustration 9.) The
edge marked “BATH FLANGE EDGE” must be parallel with the back wall. With the template lying flat, tape
firmly to eliminate any shifting.
3 Using a sharp center punch, lightly tap through the template hole center location marks onto the bath surface.
Remove the template.
4. Drill two (3) 9/32" diameter holes for the tower and five (5) 3/16" holes for the bottom rail. (Do not drill through
the template.)
IMPORTANT: THE HOLES MUST BE DRILLED AS ACCURATELY AS POSSIBLE TO INSURE PROPER
INSTALLATION AND OPERATION OF THE SHOWER DOOR.
ILLUSTRATION 9 (LEFT HAND SHOWN)
ILLUSTRATION 9A
TILE OR FINISH
MATERIAL
CEMENT
BOARD
BATH RIM
MORTAR
CAULKING
FLANGE
STUD WALL
MORTAR & FINISH
MATERIAL THICKNESS
3/16" HOLE (5)
9/32" HOLE (3)
TAPE FIRMLY
(TYP)
INNER ORANGE CIRCLE
A
TEMPLATE
BATH FLANGE EDGE
TOWER
WALL
BATH FLANGE EDGE