Haier AD092XLERA Air Conditioner User Manual


 
22
4.Trial operation
The person who has completed this installation shall be requested to conduct a test operation for
check:
Is the temperature adjuster working normally?
Does the location for installation conform to requirements?
Winding up with Protective Plastic Tape.The connection pipes,drain pipe, and the connection
wires shall be wound up with PVC tape.
The connection pipes shall also be wound up with insulating material to preserve
the temperature. The airing direction shall be from bottom to top.
NOTE!
1 Wiring method of ring terminal
For connecting line which end is a ring,its wiring method as shown in the right figure: remove
wiring screw and pass it through the end ring of connecting line,then connect it to the terminal
block and tighten screw.
Wiring methods:
Ring Terminal
T
B
Brazed seam
B=8.0-9.0(mm)
d=4.3-5.3(mm)
T=1.0-2.0(mm)
(For your referrence)
d
Wiring method of ring terminal
L N
2 Wiring method of straight terminal
For connecting line which end is not a ring, its wiring method as follows: loosen wiring screw
ans insert the end of connecting line totally into the terminal block,then tighten the screw and
pull the connecting line slightly to confirm that it is clamped firmly.
Correct crimp
connection of wire
Terminal block
Incorrect crimp
connection of wire
Crimp connection
clamp
3 Crimp connection method of connecting line
After finishing wiring.connecting line must be fastened by wire clamp,which pressed on the
external sheath of the connecting line, as shown in the right figure:
Instructions to installation