GTO SL-2000B Garage Door Opener User Manual


 
35
Limit Nut A
Open position stop –
if gate opens right to left.
Closed position stop –
if gate opens left to right.
Limit Nut B
Closed position stop –
if gate opens right to left.
Open position stop –
if gate opens left to right.
ORANGE (N/O contact)
BLUE (N/O contact)
GREEN (common)
BLACK to Motor RED
RED to Motor BLACK
Second Operator
Po
wer Cable
Limit Switches
Motor
WIRING THE SECOND OPERATOR
Step 1: With the PRO SL-1000 or SL-2000 control box open,
use a screw driver to punch out the round knockout hole located
on the bottom next to the First Operator power cable. Install the
strain relief for the Second Operator power cable. Leave about 6”
of the power cable and tighten the strain relief nut to secure the
wires.
Step 2: Run the second power cable through
PVC conduit to the Second Operator. Con-
nect the wires to the motor and limit switch-
es as shown in illustration
Step 3: Adjust the DIP switches on the
First Operator control board for the ap-
propriate dual gate settings, following
the directions on next page.
When the units are set in place and you have completed wiring the
first unit follow the instructions below.
ON
SECOND OPERATORFIRST OPERATORPOWER IN ALARM ACCESSORY RCVR
SEQ1
SEQ2
LEARN
18VAC SOLAR
~ ~ +
RED
BLK
ORG
BLU
GRN
CLS ED
G
OPN ED
G
RED
BLK
BLU
ORG
ORG
BLU
WHT
GRN
GRN
CLS ED
G
OPN ED
G
R B G
Power Cable
from First Operator
Power Cable
from Second Operator
Low Voltage Wire
from AC Transformer
RED
BLACK
ORANGE
BLUE
GREEN
RED
BLACK
ORANGE
BLUE
GREEN
RED
BLACK
ORANGE
BLUE
GREEN
RED
BLACK
ORANGE
BLUE
GREEN
First Operator Power Cable
Second Operator Power Cable
R
E
D
B
L
K
O
R
G
B
L
U
G
R
N
C
L
S
E
D
G
O
P
N
E
D
G
R
E
D
G
R
N
O
R
G
B
L
U
W
H
T
B
L
K
O
R
G
B
L
U
G
R
N
C
L
S
E
D
G
O
P
N
E
D
G
LEARN
AU
T
O
CL
OSE
INERTI
A
ST
A
TUS
BA
T
T
+
OBSTR
.
SENS.
RCVR
R
G
B
ALARM
SECOND OPERA
TOR
FIRST OPERA
TOR
POWER IN
1
8
V
A
C
S
O
L
A
R
~
~
+
ACCES
SORY
PW
R
.
S
W
.
Lock Nut
Hub
Sealing Nut
Sealing Nut
Hub
Lock Nut
Strain Relief
Wire From Second
Operator Battery
THIS STEP IS FOR SL-2000/2200
INSTALLATION ONLY
Step 1a: Run the battery jumper wire
through the PVC from the battery in
the Second Operator to the battery
in the First Operator. Use the side
strain reliefs on the control boxes to
run battery jumper wire into control
boxes. Using spade connectors, con-
nect positive to positive and negative
to negative.