GTO SL-1000 Garage Door Opener User Manual


 
12
SINGLE GAT E OPERATOR INSTALLATION
OVERVIEW OF OPERATOR INSTALLATION
GATE PREPARATION
Level
Plumb
Concrete
Concrete
Be sure the gate is properly installed and slides smoothly before installing the GTO/PRO Slide Gate Operator. The
gate must be plumb, level, and move freely. The gate must not bind or drag on the ground. Never use a wheel
on the gate, because the additional drag and resistance can cause the operator to obstruct.
The diagram below shows a single slide gate installation with recommended safety features. The operator must be
installed on the inside of the gate. GTO requires using safety edges and roller guards to help reduce the possibility
of bodily injury.
Chain
Contact Sensor
Roller Guard
Receiver
(cable in separate
conduit)
Roller Guard
CAUTION
AUTOMATIC GATE
STAND CLEAR
1-800-543-GATE
®
Operator
Contact Sensor
Contact Sensor
(REQUIRED)
(REQUIRED)
(REQUIRED)
(REQUIRED)
(REQUIRED)
Use PVC Conduit 
(not included)
Run 1000' (max.) of low
voltage wire to control
box from transformer
(wire not included).
120 Volt Indoor
Transformer
(Surge Protector
not supplied)
Roller Guard
(REQUIRED)
Chain Bracket
Chain Bracket
for power cables.
1.KEEP CLEAR! Gate may move at any time.
2.Do not allow children to operate gate or
play in gate area.
3.This gate is for vehicles only. Pedestrians
must use a separate entrance.
Moving Gate Can Cause
Injury Or Death
WARNING
!