STEP 7 Cut two pieces of standard 1" lumber (supplied by installer) to the
length and width required. Place in front and back of bottom sill chan-
nel as shown in Figure G. Secure with nails (supplied by installer).
STEP 8 Seal all holes in the cabinet with caulking compound (supplied
by installer).
Figure F
FINISHED OPENING SIZE
2" x 8" FRAME
20"
14 ¼"
14 ¼"
20"
Figure G
¾" MINIMUM
CABINET FRONT
1" THICK LUMBER
1" MINIMUM
INSIDE WALL
EXTERIOR WALL
TRIM AROUND THE CABINET
WITH A SUITABLE WOOD
MOULDING AND FINISH TO SUIT.
CAULK ALL AROUND CABINET
ON OUTSIDE TO INSURE A
WEATHER TIGHT SEAL.
¼" SLOPE
DOWN. POSITION AND
SECURE CABINET
DOWNWARD. SLOPE
OUTSIDE FOR DRAINAGE.
MAX. WALL
THICKNESS
ALLOWED 8 ½"
FRONT EDGE OF LOUVERS
MUST ALWAYS BE OUTSIDE OF
EXTERIOR WALL SURFACE
¾" MINIMUM FRONT
EDGE OF CABINET TO
INSIDE WALL SURFACE.
" SLOTTED HEAD SCREWS (3 EA. SIDE)
NAILS MAY BE USED IF DESIRED.
MOR TAR
ELECTRICAL RE CEP TA CLE
POINT "X"
CABINET
CAULK ALL SIDES
Figure H
SOLID MASONRY CONSTRUCTION
NOTE: ELECTRICAL RECEPTACLE LOCATION
FROM POINT "X" MUST BE WITHIN A MAXIMUM
RADIUS OF 69" FOR 115V UNITS.
STEP 9 Complete the installation by following STEPS 6 through 10 of Sash
Window Instructions (Page 8). Window Seal Gasket mentioned
in STEP 8 will not be required.
IMPORTANT: Before operating your unit, read STEP 10 of Sash
Window Instructions.
CONCRETE BLOCK CONSTRUCTION FRAME CONSTRUCTION