Friedrich XQ05 Air Conditioner User Manual


 
STEP 6 Inspect the unit before inserting it into the sleeve. The fan and
blower wheel should be manually rotated to insure that they turn
freely. Be sure the electrical cord will be out of the way when
inserting the unit into the sleeve.
NOTE: For your safety, DO NOT plug the electrical cord into an
electrical outlet until installation is complete.
STEP 7 If the unit checksout OK, it is readyto be placed into position on
bottom rails of the cabinet and pushed into place.
NOTE: Do all lifting of the unit by the bottom pan onlyand with
assistance or help as necessary (see Figure A).
STEP 8 Install the white chassis seal gasket (item #6, page 6) and the
gray window seal gasket (item #5). Carefully insert the white
gasket(item #6) between the chassisand the cabinet starting at
either bottom cornerand go up the side, across the topanddown
the opposite side. Insert the gray gasket (item #5) between the
window sashes as shown in Figure D. If chassis seal gasket is
not installed, the operation of the unit will be negatively affected.
Also, the operation noise and outside noise will be ampli ed.
STEP 9 Hold the decorative front as shown in Figure E. Insert the two
tabs of the Decorative Front Panel into the slots in the top of the
cabinet and lower the bottom of the decorative front to the bottom
of the cabinet. Route the electrical cord to the right or left side
of the bottom of the cabinet as required by the location of the
electrical wall outlet. Use the notches provided at the bottom of
the Decorative Front Panel for routing the electrical cord out of
the unit. Attach the decorative front to the cabinet with two (2)
No. 8 x ½" Phillips head screws(item #2, page 6).
STEP 10 CIRCUIT PROTECTION -If the air conditioneris circuit protected by a
fuse, use a "TIME DELAY" fuse or HACR type CircuitBreaker due to
momentary high currentdemand whenyourair conditioneris started.
Before operatingyourunit, verify the ampere ratingof the time-delay
fuse or circuit breaker which protects yourunit. The ampere rating
of the time-delay fuse or circuit breakershall be 15 amps. Refer to
Operation section formore detailed operatinginstructions.
Figure D
TO PREVENT AIR LEAKS AROUND
THEAIRCONDITIONER,INSERT
THE WHITE FOAM GASKET (item
#6, page 6) BETWEENTHEAIR
CONDITIONER AND THE CABINET.
CHASSIS SEAL
GASKET
GRAY FOAM
GASKET
(see illustration,
item #5 onpage6)
SCREW, #8x ½" PHILLIPSHEAD
(Seeilustration, item # 2, page 6)
2REQUIRED (1 EACHSIDE)
TAB SLOTS
NOTCHES PROVIDED
FOR ELECTRICAL
CORD EXIT
TAB
LOCATIONS
Figure E
Moving Object Hazard
Replace all panels before
operating your air conditioner.
Failure to do so can result
in injury.
WARNING
Excessive Weight Hazard
Use two or more people when
installing your air conditioner.
Failure to do so can result in
back or other injury.
CAUTION
Unplug unit when servicing.
Failure to follow these instructions can result in
death, fire, or electrical shock.
WARNING
7
Electrical Shock Hazard