Page | 18
OPERATION
• England’sStoveWorks,Inc.alwaysrecommendstheuseofamagneticstovethermometer,so
thatthetemperatureoftheunitcanbemonitored.Whenusingamagneticstovethermometer,
locatethethermometerabovethedooroneithertheleftorrightsideofthestoveandusethe
followingtemperatures
asroughguidelinestodeterminetheburnrateandheatoutputlevelof
thestove:
o Normalwoodstoveoperationshouldoccurbetween350°F(177°C)and550°F(288°C),
with350°F(177°C)to450°F(232°C)beingalowtomedium heatoutputleveland450°F
(232°C)to550°F(288°C)beinga
mediumtohighheatoutputlevel.Operatingthestove
at600°F(316°C)wouldbeconsideredthemaximumcontinuousoperatingte mperature
permissibleandunitdamagemayresultfromoperatingatthathighofaburnratefor
extendedtimeperiods.Allowingtheunittoreach650°F(343°C)orhigherisdefinedas
over‐firingandwillresultinunitdamage.
• Theoptionalroomairconvectionblowerwasdesignedtoextractthemaximumamountofheat
fromthestove,forthehighestpossibleheattransferintotheroom.Sincetheblowerisso
efficientatremovingheatfromtheunit,itis
veryimportanttoonlyoperatetheroomairblower
afterafreshwoodloadhasbeenallowedtoburnforatleastthirty(30)minutes.Allowinga
freshloadofwoodtoburnwithoutthebloweronensuresthattheentireunitreachesproper
operationtemperaturesandthatthesecondarycombustion
systemisfunctioningproperly.
Additionally,followtheguidelinesbelowforacceptableblowerspeeds.
• Whenusingtheoptionalroomairconvectionblower(PartNo.AC‐16), theblowershouldbe
operatedasfollowsdependingonheatoutputlevel:
Burnrate High MediumHigh Medium MediumLow Low
BlowerSpeed High Low Low Low Off
DONOTUSEGRATEORELEVATEFIRE–BUILDWOODFIREDIRECTLYONHEARTH
DONOTOPERATEWITHTHEMAINDOOROPEN–OPERATINGTHESTOVEWITHTHEMAIN
DOOROPENWILLCREATEANOVER‐FIRE
Creosote
–
FormationandNeedforRemoval
Whenwoodisburnedslowly,itproducestarandotherorganicvapors,which
combinewithexpelledmoisturetoformcreosote.Thecreosotevapors
condenseintherelativelycoolchimneyflueofaslow‐burningfire.Asaresult,
creosoteresidueaccumulatesonthefluelining.Whenignited,thiscreosote
makes
anextremelyhotfire.Thechimneyandchimneyconnectorshouldbe
inspectedatleastonceeverytwomonthsduringtheheatingseasonto
determineifacreosotebuildup hasoccurred.Ifcreosotehasaccumulated,it
shouldberemovedtoreducetheriskofchimneyfire.