Desa VF48H(i)(R) Indoor Fireplace User Manual


 
www.desatech.com
122272-01C 15
INSTALLATION
Continued
Figure 22 - Securing Door Rails to
Fireplace
Bottom Rail
(Use as a
Template before
Drilling)
Concrete
Screws
Top Rail
Drill Holes
into Bricks
Remove Screws
then Replace to
Secure Top Rail
Figure 21 - Installing Fireplace Screen
Ring
Screen
Push
On Nut
Screen
Rod
Bracket
Smoke Shelf
Screen
Rod
Fireplace Front
INSTALLING GLASS DOOR AND
RAIL
IMPORTANT: Install top and bot-
tom rails and hardware before
installing glass door panels.
IMPORTANT: This optional glass door kit can
NOT be used with your replace if you have
installed the optional Ash Lip Kit.
Rail installation
1. Remove screws securing top face to
rebox (see Figure 22).
2. Align holes on rail to be installed at top
and replace screws. Note: Door rails are
identical until spring clips are in place.
3. Using remaining door rail as a template,
place along front row of bricks at bottom
making sure rail front surface is ush with
replace bottom face surface. Mark hole
centers and remove rail (see Figure 22).
4. Drill 9 - 5/32" diameter holes about 1"
deep directly into bricks using a 5/32"
concrete drill bit (not provided).
5. Place rail back on bricks and align holes.
Secure using 9 concrete screws provided
with glass door kit.
6. Secure retaining clips to top and bottom
rails (see Figure 23).
Figure 23 - Mounting Door Retaining
Clips
Retaining
Clip
Top Rail
Bottom Rail