Desa RC70T Electric Heater User Manual


 
www.desatech.com
111168-01A
4
ASSEMBLY
(FOR 40, 55T, AND 70T MODELS ONLY)
These models are furnished with a nose cone
guard. Nose cone guard and mounting screws are
found in the shipping carton.
Tools Needed
5/16" Nut Driver or Wrench
1. Place nose cone guard on top of upper shell
flange. Make sure nose cone guard is on hot
air outlet end of heater.
2. Insert screws through nose cone guard and
upper shell flange.
3. Tighten screws firmly.
Figure 4 - Nose Cone Guard Assembly,
40/55T/70T Models Only
Nose Cone
Guard
Screw
Hot Air
Outlet
Upper Shell
Flange
(FOR 115T AND 165T MODELS ONLY)
These models are furnished with wheels and a front
handle. Some models are furnished with a rear
handle also. Wheels, handle(s), and the mounting
hardware is found in the shipping carton.
Tools Needed
Medium Phillips Screwdriver
3/8" Open or Adjustable Wrench
Hammer
1. Slide axle through wheel support frame. Install
wheels on axle.
IMPORTANT: Place extended hub of wheel
toward wheel support frame.
2. Place cap nuts on axle ends. Gently tap with
hammer to secure.
3. Place heater on wheel support frame assem
-
bly. Make sure air inlet end of heater is over
wheels.
4. Place front handle on top of fuel tank flange.
Insert screws through handle(s), fuel tank
flange and wheel support frame. Attach nut
finger tight after each screw is inserted.
5. Tighten all nuts firmly.
Figure 5 - Wheel and Handle Assembly,
115T/165T Models Only
Front
Handle
Hot Air
Outlet
Fuel Tank
Flange
Wheel
Support
Frame
Wheel
Cap Nut
Axle
Nut
Extended Hub
Air Inlet
Screw
Rear Handle
(If Equipped)