CyberPower PR6000LCDRTXL5U Thermostat User Manual


 
5
VERTICAZL/TOWER INSTALLATION
Step 1: Attach the base stands
Simply slide the base stands onto the bottom of the UPS, roughly 8-10”
apart.
Step 2: Attach dust covers
Insert dust covers into the rack mount ear screw holes that are not being
used.
Step 3: Rotate the Multifunction LCD Readout
Separate the front panel and the UPS. Gently lift the LCD out. Rotate it to the preferred orientation. Reinstall the display for a tower configuration.
ELECTRICAL INSTALLATION
After completing the hardware installation of the UPS, you are now ready to plug in the UPS and attach your equipment.
SAFETY PRECAUTIONS
CAUTION! - Installation environment should be in a temperature and humidity controlled indoor area free of conductive contaminants. Do not install
this UPS where excessive moisture or heat is present (Please see specifications for acceptable temperature and humidity range)
CAUTION! - Never install a UPS, or associated wiring or equipment,
during a lightning storm.
CAUTION! - Do not work alone under hazardous conditions.
CAUTION! - To reduce the risk of electric shock, do not remove the
top cover.
CAUTION! - The battery can energize hazardous live parts inside
even when the AC input power is disconnected.
HARDWARE INSTALLATION