Casablanca Fan Company 46U4M Fan User Manual


 
4
CAUTION: To reduce the risk of
personal injury, use only the
mounting hardware provided with
the approved outlet box to install
the crossbar mounting bracket.
CROSSBAR MOUNTING BRACKET INSTALLATION
CEILING
WIRING
CROSSBAR
MOUNTING
BRACKET
FLAT
WASHER
GREEN
GROUND
WIRE
CEILING FAN
APPROVED
OUTLET BOX
RIDGE
SIDE
DOWN
CANOPY INSTALLATION
CANOPY LOCK
WASHERS
CANOPY
SCREWS
CROSSBAR MOUNTING
BRACKET INSTALLED
CANOPY
CANOPY HARDWARE
CANOPY
CANOPY
HATCH
CANOPY LOCK WASHER (4)
CANOPY SCREW (4)
OUTLET BOX
MOUNTING
HARDWARE
Note: On sloped ceilings, align the
canopy opening towards the top or
room peak.
Proceed with installation as follows:
Step 1. Route the wires from the ceiling outlet box through
the crossbar mounting bracket center hole. Attach the bracket,
with ground wire and ridges down, to the ceiling fixture out-
let box with the mounting hardware included with the outlet
box.
Tighten the screws firmly by hand only, being careful not to
bend the bracket by over tightening.
Step 2. Attach the canopy to the crossbar mount-
ing bracket with three of the 8-32 x 2
1
/4 long
canopy screws and canopy lock washers.
Tighten the screw firmly by hand only.
CAPISTRANO
Casablanca