JANUARY 2008 UCCS STANDARDS 15950-6
and product data shall be submitted for approval per Division 1, Section 01300.
B. Contractor agrees that shop drawings and/or submittals processed by the Engineer are not
change orders, that the purpose of shop drawings and/or submittals by the Contractor is to
inform the Engineer which equipment and material he intends to furnish and install.
C. Submittal data and shop drawings shall conform to the following requirements:
1. All shop drawings shall be prepared according to AIA standards in the most current
version. (Computer - Aided Drafting and Facilities Management Standards). A
copy is available upon request. Some of the requirements in this document are listed
below
a. Shop drawings shall be developed using the most current version of AutoCAD
(Autodesk, Inc.) or a version that is 100% compatible with the current version.
b. Specific information shall be added to the title block of each sheet to aid in the
UCCS archiving/retrieval process for construction documentation. A copy of the
specific requirements is available from the Facilities Management CAD Office.
2. All final or as-built shop drawings for temperature control will become permanent
record documents and shall be prepared on size (36" x 24"). Plain paper and CAD
files on a standard digital media (i.e., DVD, CD, Disk, Flashdrive).
3. All submittal data shall be bound or in a three-ring hard cover binder as appropriate.
All the information shall be indexed and tabbed with reference to the specific section
of these specifications. Product data sheets shall be marked with the tag number as
indicated on the drawings. All options, ranges, and voltages (which will be provided)
shall be clearly indicated on each product data sheet.
4. The format for submittal information shall be as follows:
a. Control drawings and building plans shall be CAD-prepared drawings. Drawings
that cannot represent the total information on one drawing (i.e., a building plan)
shall be noted with appropriate match lines, cross references, and key plans.
b. The control drawing package shall consist of:
1. A title sheet listing the project title, and index of all the control drawings,
and a network schematic showing all DDC Panels and network connections
on the project. The network diagram shall indicate all communication
devices. The following information shall be provided for each network
device:
a. Location (room number)
b. Power source (breaker panel I.D. and breaker number)