12 78-8117-0985-2 Rev C
11.0 Install Termination
11.1 Slide the termination body onto the cable and remove core. Pull while unwinding, counter-clockwise, starting
with the loose end (Figure 15). Make sure the termination body (not the core) is butted up to the edge of the
vinyl tape marker previously applied (Figure 15).
NOTE: Once the termination body makes contact over the mastic seal area, there is no need to continue
supporting the assembly. DO NOT PUSH OR PULL ON THE TERMINATION ASSEMBLY WHILE
UNWINDING THE CORE.
The material being removed at this step is mixed polymersNOTE:
waste.and can be recycled with
Vinyl Tape Marker
Counter-Clockwise
Figure 15
11.2 Connect ground braid to system ground according to standard practice.
Semi-Con Insulation Shield
Ridge at End of Cable
Insulation Shield (Semi-Con)
Ridge at End
of High-K Tube
Correct Installation of Termination on Wire Shielded Cable
Cable
Insulation
Conductor
Vinyl Tape
Marker
Envioronmental
Top
Seal
Stress Controlling Compound
High-K Stress
Relief Tube