Send document comments to nexus7k-docfeedback@cisco.com
E-2
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
OL-18634-01
Appendix E Site Preparation and Maintenance Records
Contact and Site Information
Contact and Site Information
Use the following worksheet (Table E-2) to record contact and site information.
Power evaluation:
• Input power type
• Power receptacles
• Receptacle proximity to the equipment
• Dedicated (separate) circuits for power
redundancy
• UPS for power failures
• Grounding: proper gauge wire and lugs
• Circuit breaker size
Grounding evaluation:
• Data center ground
Cable and interface equipment evaluation:
• Cable type
• Connector type
• Cable distance limitations
• Interface equipment (transceivers)
EMI evaluation:
• Distance limitations for signaling
• Site wiring
• RFI levels
Table E-1 Site Planning Checklist (continued)
Planning Activity Verification Time and Date
Table E-2 Contact and Site Information
Contact person
Contact phone
Contact e-mail
Building/site name
Data center location
Floor location
Address (line 1)
Address (line 2)
City
State