Zap 815-RL Garage Door Opener User Manual


 
CONNECTING THE MAIN A/C
SUPPLY
The Operator should be installed in accordance
with local codes and national electric code.
To reduce the risk of electric shock, this equipment
has a grounding type plug that has a third
(grounding pin). This plug will only fit into a
grounding type outlet. If the plug does not fit into
the outlet, contact a qualified electrician to install the
proper outlet. Do not change the plug in any way.
If it is required to permanently wire the Control
unit to the permanent electric wiring in the
building then this should be completed by a
qualified electrician.
The factory fitted Mains power cord should be
secured next. A 1.8 metres / 6 ft main power cable
is supplied ready connected to the 800-R
controller. It is plugged into the green 3-way
connector at the bottom left hand side of the
circuit board. (Pic 24)
The power plug can then be located next to a
convenient power socket.
DO NOT PLUG THE POWER PLUG INTO THE
SOCKET YET. Please ensure that any unused
cable is coiled and secured using cable clips or
cable ties provided.
If the Control unit is to be wired permanently into
the house wiring circuit, then the main 120 volt
(Europe: 220 volt, UK 240 volt) supply lead, with
plug attached, should be removed from the
Control unit case as follows:
1. Ensure that the main supply plug is
disconnected from the line power supply.
2. Unscrew the outer clamp nut of the cable
gland through which the main supply cable
passes.
3. Unplug the GREEN power connector from the
panel socket.
4. Unscrew the three supply wires from the
GREEN power connector.
5. Gently pull the cable through the loosened
cable gland.
6. Note that two sizes of cable gland entries are
provided in the Control unit case, both 3/4”
and 7/8”. Either entry may be used to provide
a conduit entry point for the new supply wiring.
Whichever entry point is not used should be
secured with a blanking plug of the correct size.
9
Pic 23
Pic 24