6. Run the electrical line into evaporator on bottom of left side over insulation.
Wires should be at least 36” long going into the cabinet.
7. Re-install interior assembly.
Slide interior assembly back into housing gently. Re-attach using the two screws. Flow a small
amount of dry nitrogen through the tubing during brazing. This is to displace oxygen and prevent
the formation of copper oxide. The solenoid should be energized for a free flow without building
up pressure in the tubing.
-15-