Whirlpool RH2 300 Air Conditioner User Manual


 
centerline
Panel C
7.
To wire through top, mark a line
7-1/2" from the right of the centerline on
the underside of the cabinet. Mark the
point on this line that is 2" from back wall.
Drill a 1-1/4" diameter hole through the
cabinet at this point. Note: If a cord-
connection kit is used, drill a 1-5/8"
diameter hole.
Numbers
correspond
to steps.
6.Determine and clearly mark a
vertical centerline on the wall and cabinet
in the area the vent opening will be made.
3.
10.
4. 14.
5. 12. 13.
5. 12. 13.
7-1/2"
centerline
2"
from wall
(not cabinet
frame)
7-1/2"
centerline
centerline
3/4"
65-1/4"
(to floor)
To wire through rear, mark a line 7-1/2" from
the right of the centerline on the wall. Mark
the point on this line that is 65-1/4" from the
floor (or 3/4" from underside of cabinet).
Drill a 1-1/4" diameter hole through wall at
this point.
To transition from a 3-1/4" x 10" rectangular
vent to a 7" round vent and vent through
the roof —
Start by making a 4" x 10-1/2" rectangle on
the underside of cabinet bottom:
a. Mark lines 1-1/2" and 5-1/2" from the
back wall on the centerline of the
underside of cabinet.
b. Mark lines 5-1/4" to the right and left of
the centerline on the underside of
cabinet.
c. Use saber and keyhole saws to cut a
rectangular opening for vent.
To make a 4" x 10-1/2" rectangle on the
underside of cabinet top and bottom:
a. Mark lines 1-1/2" and 5-1/2" from the
back wall on the centerline of the
underside of cabinet.
b. Mark lines 5-1/4" to the right and left of
the centerline on the underside of
cabinet.
c. Use saber and keyhole saws to cut a
rectangular opening for vent.
d. Repeat steps a-c for the underside of
the top of the cabinet.
If venting through the wall with 3-1/4" x 10"
rectangular vent —
To make a 4" x 10-1/2" rectangle in the wall:
a. Measure from floor 65-7/8" and 62-3/8"
(or 1/8" and 3-5/8" down from underside
of cabinet) and mark on the centerline
on the back wall.
b. Mark lines 5-1/4" to the right and left of
the centerline on the underside of
cabinet.
c. Use saber and keyhole saws to cut a
rectangular opening for vent.
Now make a 7-1/8" x 7-5/8" slot on the
underside of the cabinet tops.
d. Mark lines 5" and 5-1/2" from the back
wall on the centerline on the underside
of the top of cabinet.
e. Draw two 7-1/8" circles using the marks
made in step d as center points.
f. Use saber and keyhole saws to cut a
slotted (oval) opening to make installing
7" round vent easier.
*1-1/2"
5-1/4"
cabinet cutouts
5-1/4"
7-5/8"
*5-1/2"
*5"
* from wall, not
cabinet frame
*1-1/2"
*from
wall not
cabinet
frame
7-1/8"
R
*1-1/2"
*5-1/2"
* from wall, not
cabinet frame
*5-1/2"
5-1/4"
5-1/4"
cabinet
cutouts
8.