Weil-McLain EGH-125 Boiler User Manual


 
EGH-105 to EGH-125 EGH-105 to EGH-125
EGH-105 to EGH-125 EGH-105 to EGH-125
EGH-105 to EGH-125 Control Supplement
Part Number 550-110-677/0299
22
Final adjustmentsVII
1. Follow EGH Manual instructions for Final Adjustments, Section VII,
including filling the boiler and skimming steam boilers.
Skimming the boiler as described in Section VII of the
EGH Manual requires firing the boiler. Always follow
boiler Operating instructions, Figure 11, when starting
the boiler. Failure to do so could result in severe personal
injury, death or substantial property damage.
2. Inspect base insulation as instructed in Section VII of the EGH Manual.
Before proceeding:
1. Follow Operating instructions, Figure 11, to start boiler.
2. If boiler starts correctly, proceed with Check-out procedure, Section
VIII of this Supplement.
3. If boiler fails to start, check:
Loose connection or blown fuse?
Limit setting below boiler water temperature or steam pressure?
Thermostat below room temperature?
Manual reset device needs to be reset?
Gas not turned on at meter and boiler?
Incoming natural gas pressure less than 5" W. C.?
4. If above fails to eliminate the trouble, refer to Check-out procedure
— troubleshooting
in this Supplement, Section VIII.
To place boiler in operation: