Weil-McLain 550-100-067/0608 Boiler User Manual


 
Part number 550-100-067/0608
5
g a s -f i r e d w a t e r b o i l e r User’s Information Manual
Annual startup and general maintenance
Figure 1 Service and maintenance schedules
OWNER MAINTENANCE (see the following pages for instructions)
BEGINNING OF SEASON
Contact your boiler service technician to inspect, service and start
up your boiler. You must have an annual start-up performed by a
qualified service technician to ensure reliable operation of the boiler
and system.
DAILY
Check boiler area
Check air openings
Check pressure/temperature gauge
Verify boiler front door is secure
MONTHLY
Check vent piping
Check air piping
Check relief valve
Check condensate drain system
Check automatic air vents (if used)
PERIODICALLY
Test low water cutoff (if used)
Check time and date on the U-Control display
EVERY
6 MONTHS
Check boiler piping (gas and water)
Operate relief valve
END
OF SEASON
Shut boiler down (unless boiler used for domestic water)
Follow the service and maintenance procedures given throughout this manual and in component literature
shipped with the boiler. Failure to perform the service and maintenance could result in damage to the boiler or
system. Failure to follow the directions in this manual and component literature could result in severe personal
injury, death or substantial property damage.