5
MOUNTING THE SIDE BURNER
Connect the corrugated gas line to the side burner valve located on
the back right hand side of side burner.
TEST CONNECTIONS
All connections and joints must be thoroughly tested for leaks in
accordance with local codes and all listed procedures in the latest
edition of ANSI Z223.1/NFPA 54.
BUILT-IN GAS LINE LOCATIONS
GENERAL CONSTRUCTION DETAILS
• Summit
®
Built-In side burner unit should be on site before construction
begins.
• All dimensions have a tolerance of plus or minus +/-
1
/
4
” inch.
Provide access for a corrugated gas line depending on the location of the
side burner in relation to your main gas supply and regulator position.
Area should be kept clear of sharp, jagged, or extremely abrasive surfaces
to avoid possible damage to gas supply lines. Exercise caution when pulling
gas lines through built-in structure.
A 3/8 “ inch stainless steel corrugated gas line should be used to connect
the side burner to the regulator accessory coupling.
ƽWARNING: Do not use a rubber gas hose.
4YPICALTANK
CABINETLOCATION
3!%STAINLESS
CORRUGATEDGASLINE
GAS INSTRUCTIONS
ƽ DANGER
Do not use an open fl ame to check for gas leaks. Be
sure there are no sparks or open fl ames in the area
while you check for gas leaks. This will result in a fi re
or explosion which can cause serious bodily injury or
death, and damage to property.
Be sure to secure the side burner unit with non corrosive screws
anchored into the fi nished surface of the “island structure”.
Replace the plastic plug on the front mounting hole to conceal the screw
once side burner is secure.