Vulcan-Hart VIR1F Boiler User Manual


 
Fig. 15
3. Engage union nut on manifold pipe of the broiler with the male fitting on the next unit, and
draw up union hand-tight. Be sure units butt both front and rear.
4. Continue to level up and connect manifold pipe until all broilers in the battery are connected,
then tighten all manifold unions gas-tight.
Questions or concerns regarding the installation procedures may be addressed by calling the
Vulcan-Hart Service Department 1-800-814-2028.
– 8 –