Vulcan-Hart VIR1F Boiler User Manual


 
INSTALLATION, OPERATION AND CARE OF
HEAVY DUTY BROILERS
PLEASE KEEP THIS MANUAL FOR FUTURE USE
GENERAL
The manufacturer suggests that you thoroughly read this entire manual and carefully follow all of
the instructions provided.
Your Vulcan Broiler is produced with quality workmanship and material. Proper installation, usage
and maintenance of your broiler will result in many years of satisfactory performance.
INSTALLATION
UNPACKING - ALL BROILER MODELS
This broiler was inspected before leaving the factory. The transportation company assumes full
responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking,
check for possible shipping damage. If the broiler is found to be damaged, save the packaging
material and contact the carrier within 15 days of delivery.
Remove the small wood slats and wire used to hold burners and broiler grid in place.
If the appliance is to be installed on equipment requiring electrical connections verify that the
electrical service and type of gas supply (natural or propane) agree with the specifications on the
rating plate.
MODELS
RATING PLATE LOCATION
VIR1BF On the Manifold Cove
r
VIR1SF and VIR1CF Behind Kick panel attached to burner box
VIR1F (Modular) On the Manifold Cove
r
If the supply and equipment requirements do not agree, do not proceed with the installation.
Contact your dealer or Vulcan-Hart immediately.
– 4 –