– 114 –
No.
4
Part name
Side cabinet
Procedure
1. Detachment
1) Carry out the operation in 1. of
Q
and 1. of
R
above.
2) Remove the screws fixing the inverter assembly
and the side cabinet. (ST1T Ø4 × 10, 3 pcs.)
3) Remove the screws for the side cabinet and the
valve fixing plate. (ST1T Ø4 × 10, 2 pcs.)
4) Remove screw for the side cabinet and piping
panel (rear). (Hexagonal screw Ø4 × 10, 1 pc.)
5) Remove screw for the side cabinet and the
bottom plate. (Hexagonal screw Ø4 × 10, 1 pc.)
6) Remove screws for the side cabinet, heat
exchanger and the fin guard.
(Hexagonal screw Ø4 × 10, 4 pcs.)
7) Remove the screw of the holder fixing plate and
the side cabinet (C type Ø4 × 8, 1 pc)
2. Attachment
1) Temporarily suspend the side cabinet on the
inverter assembly using the hook.
2) Mount the removed screws in the opposite
procedure to that during detachment.
Remarks
Side cabinet C Type screw
(serration)
Inverter Ass’y
Bottom plate
Fin grad
Heat
exchanger
Piping panel
(rear)
Valve fixing plate
Hook
Holder fixing
plate